Fluxys LNG will offer 4 Stand Alone Berthing Rights (“SABRs”) via auction.
The SABRs are offered for the period starting on the 1st of August 2024 and ending on the 31st of August 2024
Fluxys LNG will offer 4 Stand Alone Berthing Rights (“SABRs”) via auction.
The SABRs are offered for the period starting on the 1st of July 2024 and ending on the 31st of July 2024
Fluxys LNG will offer 5 Stand Alone Berthing Rights (“SABRs”) via auction.
The SABRs are offered for the period starting on the 1st of September 2024 and ending on the 30th of September 2024
Fluxys LNG will offer 2 Stand Alone Berthing Rights (“SABRs”) in an auction.
The SABRs are offered for the period starting on the 1st of February 2024 and ending on the 29th of February 2024.
Fluxys LNG will offer 4 Stand Alone Berthing Rights (“SABRs”) via auction.
The SABRs are offered for the period starting on the 1st of April 2024 and ending on the 30th of April 2024.
Fluxys LNG will offer 4 Stand Alone Berthing Rights (“SABRs”) via auction.
The SABRs are offered for the period starting on the 1st of May 2024 and ending on the 31st of May 2024
The recent Auction Window where Additional Volume and Priority Booster Capacity was offered for the storage years 2024-2025 to the market ended successfully yesterday on 5 March 2024.
Bids can be submitted for natural gas (H-gas) as well as for biogas.
The delivery period runs from 1 January 2024, 06:00 hours to 1 July 2024, 06:00 hours.
Fluxys TENP GmbH is tendering an estimated total quantity of H-gas of 207,000 MWh and biogas of 17,468 MWh.
Interested bidders can submit their bids by 27 November 2023 at 14:00 hours at the latest.
Fluxys TENP GmbH is tendering an estimated total quantity of 207,000 MWh natural gas (H-gas) and 19,435 MWh biogas.
The delivery period runs from 1 July 2024, 06:00 hours to 1 January 2025, 06:00 hours.
Interested bidders can submit their bids by 28 May 2024 at 14:00 hours at the latest.
The prequalification phase for both tenders ends on 22 May 2024 at 14:00 hours.
For the Trading Hub Europe (THE) market area the transmission system operators have recalculated the uniform tariff from 1 January 2023 on the basis of the decision “Approval of the recalculation of the reference price for the year 2023 (REGENT-recalculation 2023)”, BK9-22/615 of the Federal Network Agency (BNetzA).
Interconnector has today published the latest version of its Charging Statement which includes the Annual Tariff Publication and Commodity Charge formulae for Gas Year 2024-25
Interconnector has today published the latest version of its Charging Statement effective from 21st December 2023.
The Interconnector Commodity Charge will be referenced to NBP DA EEX from 2nd April 2024 onwards
Fluxys LNG will offer 1 Stand Alone Berthing Rights (“SABRs”) in an auction.
The SABR is offered for the period starting on the 1st of January 2024 and ending on the 31st of January 2024.
Etant donné l’importance de la canalisation transfrontalière BBL pour la transition énergétique, Fluxys et Gasunie ont convenu conjointement d'acheter la participation de 20 % détenue par le copropriétaire Uniper dans la société du gazoduc. Aujourd’hui, Fluxys détient donc 25% et Gasunie 75% de BBL. La transaction a eu lieu suite à l’exercice du droit de préemption de Gasunie et Fluxys. La société BBL possède et exploite un gazoduc bidirectionnel de 235 kilomètres entre Balgzand aux Pays-Bas et Bacton en Grande-Bretagne.
Fluxys Belgium offers the market the possibility to give a strong signal that the amount of capacity from Belgium to France is still needed by subscribing these capacities during the yearly auctions of July 2024 in the long-term. Therefor, for the capacity subscriptions for period GY2027/2028 until GY2038/39, Fluxys Belgium will only accept and allocated long-term subscriptions, meaning subscriptions for a duration of at least 10 consecutive years.
Fluxys TENP GmbH informs about the capacity offer in the yearly auction of PRISMA on 1 July 2024 and about the tariffs for the calendar year 2025.
Dunkerque LNG offre sa capacité de regazéification disponible (3,5 Bcma) et invite les entreprises intéressées à contacter l'équipe commerciale pour en savoir plus.
commercial@dunkerquelng.com
Fluxys, groupe indépendant d'infrastructures énergétiques, et Advario, fournisseur de solutions de stockage et d'infrastructure, progressent vers la prochaine phase de leur projet commun de terminal d'ammoniac à faible émission de carbone dans le port d'Anvers, en Belgique.