Interconnector Planned Maintenance Shutdown - Consultation Closed
06.10.2023News
Following our stakeholder consultation issued on 01 September and concluding on 02 October, INT confirms a provisional planned maintenance shutdown period of up to 20 days commencing on Sunday 01 September 2024.
The duration will be confirmed in April 2024.
There will be no flow through the Interconnector in either direction for the duration of the maintenance period.
Media release here.