Incremental Capacity Process 2017

    The following diagram illustrates the key dates of the incremental process in 2017:

     

    3 March 2017

     

    6 April 2017

     

    1 June 2017

     

    27 July 2017


     

    Annual Yearly
    Capacity Auctions

     

    CAM NC 2.0 Entry
    into force

      Deadline submission of non-binding
    demand indications
     

    Publication of
    DAR

     
             

     

    Step 1 – Non binding demand indications

    Parties interested in incremental capacity could submit non-binding demand indications. However in the 2017 market demand assessment, Fluxys has considered non-binding demand indications submitted no later than 1 June 2017 (cob). Non-binding demand indications received after this deadline were considered in the next market demand assessment – either in 2019.

    Non-binding demand indications could be submitted using the non-binding demand indications template

     

    Step 2 – Demand Assessment Reports (DAR)

    Since 27 July 2017 the DAR of the different Fluxys Group companies are published at this location and on the ENTSOG website. For the German market the documents can be found on the FNBGas website


    Fluxys
    Company
    IPs/Market Areas TSOs Document
    Fluxys Belgium  ZTP-TTF  Fluxys Belgium / GTS DAR ZTP-TTF
    Fluxys Belgium ZTPL-TTF Fluxys Belgium / GTS DAR ZTPL-TTF
    Fluxys Belgium  ZTP-PEG Fluxys Belgium / GRTgaz
    DAR ZTP-PEG
    Fluxys Belgium ZTPL-PEG Fluxys Belgium / GRTgaz
    DAR ZTPL-PEG
    Fluxys Belgium ZTP-NCG
    Fluxys Belgium / Fluxys TENP, OGE, Thyssengas
    DAR ZTP-NCG
    Fluxys Belgium ZTP-GASPOOL
    Fluxys Belgium / GASCADE
    DAR ZTP-GASPOOL
    Fluxys Belgium ZTP-IZT Fluxys Belgium / Interconnector
    DAR ZTP-IUK
    Fluxys Deutschland GASPOOL-RU Fluxys Deutschland, Gasunie Deutschland, GASCADE, NEL Gastransport, OPAL Gastransport DAR GASPOOL-RU
    Fluxys Deutschland
    GASPOOL-NCG

    Fluxys Deutschland, GASCADE, Gasunie Deutschland, GRTGaz Deutschland, JordgasTransport, Nowega, ONTRAS Gastransport, OGE

    DAR GASPOOL-NCG
    Fluxys TENP
    NCG-ZTP Fluxys TENP, OGE, Thyssengas / Fluxys Belgium
    DAR NCG-ZTP
    Fluxys TENP
    NCG-Switzerland Fluxys TENP, OGE, Terranets BW
    DAR NCG-Switzerland
    Fluxys TENP
    NCG-TTF Fluxys TENP, OGE, Thyssengas / GTS
    DAR NCG-TTF
    Interconnector IZT-ZTP Interconnector / Fluxys Belgium DAR INT-ZTP
    Interconnector IBT-NGG Interconnector / National Grid Gas DAR INT-NGG

     

    You can also consult the Demand Assessment Reports on the ENTSOG website