Connect local producers of Non-Compatible gas to the Belgian grid

Connect local producers of Non-Compatible gas to the Belgian grid

Your point of contact

Connect local producers of Non-Compatible gas to the Belgian grid

Your point of contact

Play an important role in Belgium's energy mix. Get your Non-Compatible gas into our grid and supply households and businesses with a carbon-neutral energy source.

Request a gas connection

You want to connect your local gas production to the Belgian grid:

  • Fill in our information form.
  • Send your completed form to info.transport@fluxys.com.
  • We will then get in touch with you to make an appointment.
  • At our first meeting, we will discuss your injection requirements and run through the full connection process in detail.

 

Next steps  

Your feasibility study

This feasibility study will indicate the most advantageous connection options for your site. Feasibility studies, which take at least 8 weeks to complete, look into:

  • The best technical route for your connection
  • The capacity of Fluxys' Connection and Blending Station injection station and its required functionalities
  • The permits required to build the Connection and Blending station
  • How much time obtaining all those permits will take
  • Check if the blending the Non-Compatible Gas is possible at the producer's location; this depends on the composition of the Non-Compatible Gas.

 

Your offer and Standard Connection Agreement - Local Producer Non-Compatible Gas

Once the feasibility study has been concluded, you will receive a customised offer with:

  • A schedule for your connection
  • All the relevant technical data concerning your connection and the construction of Fluxys' Connection and Blending Station
  • A budget: consisting of a part bank guarantee and a part cash (see next point "who bears which costs")
  • The annual capacity for which you will subscribe
  • The amount of the bank guarantee.

In the Standard Connection Agreement - Local Producer Non-Compatible Gas, you confirm that you are one of our customers. You can consult this document in French or in Dutch and the appendixes in French or in Dutch.

 

Who will bear which costs?

To promote the injection of renewable gas into the transmission network, Fluxys Belgium supports these connections and facilitates the injection of Non-Compatible Gas in the following way:

Costs for the Injection Station: 50% covered by Fluxys Belgium and 50% covered by the producer, provided that it concerns the injection of green gas. In other cases, 100% covered by the producer.
Connection costs (pipeline): 100% covered by the producer.
Bank guarantee: The producer's share of the cost is covered by a bank guarantee corresponding to the transmission capacity to be booked for a period of 15 years.
Cash reimbursement: If the amount to be paid by the producer exceeds the value of the transmission capacity to be booked (at the regulated tariff) over a period of 15 years, this excess amount is covered by a cash payment. The cash portion covered by the producer will be reimbursed over a period of 15 years.
Electricity costs: The electricity costs for the Connection and Blending Station are covered by the producer.

 

What is the waiting time for your connection?

The time elapsing between your application and the commissioning of your connection will depend on a number of factors:

  • The duration of the permit procedures
  • The length of the pipeline to be installed
  • The construction and commissioning of the Connection and Blending station
  • The technical complexity of the connection

Due to the duration of the permitting procedures, it is advisable to take into account a timeframe of 24 to 46 months.