Fluxys Deutschland Transmission

Products overview
-
FZK
Firm freely allocable capacity
-
DZK Entry to DZK5 Entry
Firm dynamically allocable capacity
-
uFZK
Interruptible capacity
Book the products
Already a customer at Fluxys TENP?
Not yet a customer at Fluxys Deutschland?
REMIT
Calculation of the technical capacities of Fluxys Deutschland GmbH
According to Art. 20 (1b) EnWG, German Transmission System Operators are obliged to determine the Entry and Exit capacities. Below you will find a description of the methodology used by Fluxys Deutschland GmbH to calculate the technical transport capacities.
Useful links for you
-
Become-a-shipper-at-fluxys-deutschland
Become a shipper
-
TandC_Fluxys-Deutschland
Terms & Conditions
-
Tariff_Fluxys-Deutschland
Tariffs
-
NEL-maintenance
Maintenance
-
Welcome to the Fluxys Electronic Data Platform
Electronic Data Platform
-
DE-transparency-requirements
Transparency Requirements