Fluxys TENP Transmission

* All assignment restrictions for dynamic allocable capacities are available in Annex 4 of the General Terms and Conditions. | |||
Greifswald:
|
- Bunde |
Ludmin II: |
- Bunde |
Interested in our interruptible capacities?
You can find an overview of all available capacities, including interruptible capacities, on our Electronic Data Platform. Calculation of the technical capacities of Fluxys TENP GmbH
According to Art. 20 (1b) EnWG, German Transmission System Operators are obliged to determine the Entry and Exit capacities. Below you will find a description of the methodology used by Fluxys TENP GmbH to calculate the technical transport capacities.
Useful links for you
-
Become-a-shipper-at-fluxys-tenp
Become a Transmission shipper
-
TandC_Fluxys-TENP
Terms & Conditions
-
Tariff_Fluxys_TENP
Tariffs
-
Price calculator
Price Simulator
-
TENP-maintenance
Maintenance
-
Welcome to the Fluxys Electronic Data Platform
Electronic Data Platform
-
TENP-transparency-requirements
Transparency Requirements