Of the required Minimum Flow Rate of 11.1GWh/h, an aggregated flow commitment of 9.16GWh/h has been achieved to support the planned Pipeline Inspection Procedure taking place in October 2023.
All UMM publications regarding Interconnector will now be exclusively posted on the ENTSOG Transparency Platform.
We have put some of the most frequently asked questions about coronavirus from our network users into a handy Q&A overview. If you have any more questions or need further information, please feel free to contact us. You can always find the information about our COVID-business continuity plan on the website.
INT confirms a provisional planned maintenance shutdown of up to 20 days commencing 01 September 2024
INT is pleased to inform you that our 2023 Pipeline Inspection Procedure has been successfully completed.
Fluxys LNG has 1 remaining unloading slot on sale on 4 January 2024 after the auction of 14 December 2023 at 14h.
The slot will be allocated on a first committed first served basis.
Fluxys LNG is offering a Slot to unload, store and regasify a LNG cargo in the Zeebrugge LNG Terminal, starting on 12 July 2023.
For this cargo, Fluxys LNG has upgraded the standard Slot size and commercializes as a bundle the firm rights to unload, store and regasify up to 165 000 m³ LNG over 10 days.
On 6 April 2023, CREG has approved Fluxys Belgium's adapted proposal for natural gas transmission tariffs for the 2024-2027 regulatory period.
From 30 January to 17 February 2023, Fluxys Belgium is holding a market consultation regarding the regulatory documents applicable for transmission.
Since firm capacity for April is sold out on the VIP THE-ZTP, Fluxys Belgium intends to offer interruptible capacity in the upcoming Monthly auction on 27 March 2023.
Annual Interruptible Capacity made available via IAM for use within INT's Ten Year+ Annual Capacity Structures.
We decided to extend current Scheduling Congestion Period as from Monday 20th of November.
Fluxys LNG has 1 remaining Stand Alone Berthing Right (“SABR”) on sale for October 2023.
The SABR is offered for the period starting on the 1st of October 2023 and ending on the 31st of October 2023 and allocated on a first committed first served basis.
Fluxys LNG has 2 remaining Stand Alone Berthing Rights (“SABR”) on sale for November 2023.
The SABRs are offered for the period starting on the 1st of November 2023 and ending on the 30th of November 2023 and allocated on a first committed first served basis.
Following a significant growth in the truck loading activities at the Zeebrugge terminal, Fluxys LNG has already taken several actions to maximize the truck loading offer and its utilisation. Fluxys LNG has for example implemented scheduling congestion rules in the regulatory documents and is investing in four new self-loading bays.
From 16 June to 07 July 2023, Fluxys Belgium is holding a market consultation to propose adjustments to its regulatory documents for transmission with a focus on changes to the Access Code for Transmission Attachment B.
From 23 March to 14 April 2023, Fluxys Belgium is holding a market consultation regarding the regulatory documents applicable for transmission with a focus on the merger of the ZTP Physical and ZTP Notional Trading Services and the stop of the Imbalance Transfer Service and Imbalance Pooling Service.
Bids can be submitted for natural gas (H-gas) as well as for biogas.
The delivery period runs from 1 January 2023, 06:00 hours to 1 July 2023, 06:00 hours.
Fluxys TENP GmbH is tendering an estimated total quantity of fuel gas of 210,000 MWh.
Interested bidders can submit their bids by 11 October 2022 at 14:00 hours at the latest.
Interconnector has coordinated with its adjacent grid operators and is proposing a planned maintenance shutdown period in the month of September 2024.
Interconnector’s Pipeline Inspection Procedure is planned to commence on 1 October 2023